Total 13,592.65 MU has been generated from Indira Sagar Power Station till end of month July' 2010 since inception.
The Omkareshwar Power Station generated 80.86 MU against the target of 50.00 MU for the month of July 2010.
Topographical Survey of RTPP has been completed.
The drilling of bore holes is under progress for Geo-Technical investigation. The samples for lab tests have been collected and deposited with MANIT, Bhopal. Test report is awaited.
The scheme of power evacuation is obtained from Madhya Pradesh Power Transmission Co. Ltd., which has been forwarded to NTPC.
The action is in progress for obtaining NOC from AAI for RTPP, as per laid down procedures of AAI.
June 2010
Indira Sagar Power Station generated 74.62 MU against the target of 61.00 MU during Month of June 2010.
Omkareshwar Power Station generated 41.18 MU during the month of June 2010.
May 2010
This month ISPS has generated 96.30 MU against the target of 72 MU.
Omkareshwar Power Station generated 49.38 MU against the target of 36.00 MU during the month of May 2010.
RTPS - Global Tender for the work of availing Consultancy Services for CDM Benefits has been floated on 11-05-2010
April 2010
Indira Sagar Power Station generated 159.12 MU against the target of 72.00 MU during Month of April 2010.
Omkareshwar Power Station generated 75.57 MU against the target of 35.00 MU during the month of April 2010.
The work of preparation of DPR of Reva Thermal Power Station is being carried out by NTPC Ltd.
RITES Ltd is being carrying the Consultancy Services for Preparation of Pre Feasibility Report and Detailed Project Report for Coal Transportation & Railway Sidings of Reva Thermal Power Project.
Central Water Commission (CWC) has submitted the preliminary report on Hydrological studies
March 2010
During the financial year 2009-10, 2118.33 Million units of power generated from Indira Sagar Power Station.
The Omkareshwar Power Station generated 952.89 MU against the target of 934.00 MU for the Financial Year 2009-10.
February 2010
Indira Sagar Power Station generated 181.86 MU against the target of 150.00 MU during Month of February 2010.
Omkareshwar Power Station generated 80.72 MU during the month of Feruary.
Work of Social Impact Analysis (SIA) Studies and Base Line Survey of Reva Thermal Power Station has been awarded to Indore School of Social Works on 02-03-2010.
The Consultancy Services for Preparation of Pre Feasibility Report and Detailed Project Report for Coal Transportation & Railway Sidings of Reva Thermal Power Project has been awarded.
January 2010
Total 12,748.95 MU has been generated from Indira Sagar Power Station till end of year 2009 since inception.
The Omkareshwar Power Station generated 132.06 MU against the target of 94.00 MU for the month of January 2010.
Central Water Commission has been approached for carrying the Hydrological & Water withdrawal studies for Reva Thermal Power Station Project (RTPP).
NHDC has placed order to IIT Roorkee for Site Specific Seismic Studies of the RTPP. The studies are underway.
Bids are under evaluation to award the work of Topographical Survey of RTPP Site.
Retendering has been done for carrying out Social Impact Assessment and Base line Survey of the Project.